1、 Berths #1 and #2 and the yard behind are for break bulk cargos.
2、 Berths #3, #4, #5, #6, #7 and #8 and the yard behind are for containers.
3、 The designed annual container throughput capacity is 2,350,000 TEUs and break bulk 5 million tons.
4、 Short-Term Yard Planning: 22,218 container slots and about 260,000 square meters of break bulk stacking yard.
5、 Roads and other auxiliary facilities are also considered in the planning.
6、 Key constructions for recent period:
a) The construction of Timber Fumigation Inspection Zone is planned to be completed in 2007. It will be used for imported timber fumigations. The annual capacity is about 1,200,000 square meters.
b) Yards #313 and # 314 is for empty container and break bulk stackings. The total area is 41,650 square meters. The construction will be completed in 2007.
c) Yard #317A is for break bulk storage with an area of 17,000 square meters. The construction is expected to complete in early 2008.
d) Yard #110 will also be used for break bulk stacking with an area of 80,000 square meters. The construction is expected to complete in middle 2008.